TitleProduct

15mm CE Certified Brass Forged Compression Equal Tee (AV7013)

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-11 04:39

  • Browse the number:

    136

Send an inquiries

Company Profile

Zhejiang Italy Copper Industry Co., Ltd.

By certification [File Integrity]

Contact:Ms. Sophia(Mr.)  

Email:

Telephone:

Phone:

Area:Zhejiang

Address:Zhejiang

Website: http://italy-copper.cnfuelpump.com/

Product Details


15mm CE Certified Brass Forged Compression Equal Tee (AV7013)

* Body: Brass

* With CW617 closed clamp

* Standard: EN1254-2

* Size: 15~64mm

* Relative products: Coupling, straight, elbow, ball valve, brass valves types. Brass fittings etc.
Model NO.:AV7013 Mould Size 8mm-64mm  Packing mould &samples  
Structure:Universal-Golden, Nickel , chromed  Sureface color: golden, nickel , chromed Neutral pack-Plastic bag, inner box, carton Open mould time: 15days after confirmed drawing   
Raw Material:Brass Bar   Or follow customized design Samples time :within two week   
Connection:Male thread Thread : BSP , NPT
 
     

Differ types fittings




Processing view





Our services




Samples:
1) we can make the samples according to customer's samples or designs.
2) Our designer team can finish the samples timely, the exact sample delivery time depends on thesample's style, usually in 15 working days.
3) For New design samples, the buyers have to pay for the relative model fee. (When your order reach a certain amount, we will return back the model fee to you

Price Terms:
FOB, CRF,CIF.etc.
WE ACCEPT MANY RATE , SUCH AS RMB, US DOLLAY, EUR, KORAD, POUND..ETC 

Payment Terms: 
1) T/T, 30% T/T deposit before production, pay the balance before shipment.
2) L/C at sight (for large quantity order)
3) 100% T/T in advance, D/P

Order and Mass Production:
1) We will send PROFORMA INVOICE to you when the order is confirmed.
2) We will start to have mass production when confirm our sample and 30% T/T deposit received.
3) Quality is under the control and supervision during the production.
4) Packing information will be confirmed before the production finished, If no special requirment, using our normal package.



 Quality control and inspection:



1) Will be check by QC when Material & accessories inspection up arrival
2) In line control on Each Step 
3) Every one valve will be comprehensive review before packing
4) Sales will be spot check before shipping
 5) Third Party inspection Such as CE, SABS and so on
 6) Original authorization through ISO9001:2008



.